Substations
- S/S 220/110/30/10 kV Bilice (projects for the replacement of part of the 110 kV and 220 kV equipment)
- S/S 380/220/110/10 kV Konjsko (projects for the replacement of part of the 220 kV equipment)
- S/S 110/35/20 kV Vrbovsko
- S/S 110/35/20 kV Stari Grad
- S/S 110/10(20) kV Kukuzovac
- S/S 110/10(20) kV Kneginec
- S/S 110/20 kV Sv. Vinčenat
- S/S 110/20 kV Buzet
- S/S 110/20 kV Sesvete (GIS*)
- S/S 110/10(20) kV Dugopolje (GIS)
- S/S 110/10(20) kV Ploče (GIS)
- S/S 110/35 kV INA - Rijeka Oil Refinery (GIS)
- S/S 35/10(20) kV Pregrada
- S/S 35/10(20) kV Kraljevica
- S/S 35/6,3/0,42 kV Janaf at Slavonski Brod oil terminal
- S/S 35/10(20) kV Otok
- S/S 35/10(20) kV Križ
- S/S 35/10(20) kV Ružić
- S/S 35/10(20) kV Generalski Stol
* GIS - gas insulated switchgear
Up to the present, over 500 projects have been completed for S/S 10(20)/0.4 kV (250 - 1000 kVA) distribution substations.