Projects for the electric power industry

Project documentation for the 2x400 kV S/S Ernestinovo - S/S Pécs transmission line, section: Ernestinovo - state border

Nominal voltage 400 kV 
Section length 44 km 
Number of towers
- suspension
- tension
 
90
27
Total 117 
Average span 376 m 
(without connection span)